  篇一:建筑工程造价毕业设计

工程造价毕业设计方案

  目 录

  1编制说明 .................................................................................................................... 6

  1.1 编制依据 .......................................................................................................................... 6

  1.2编制原则 ........................................................................................................................... 6

  1.3建设标准 ........................................................................................................................... 7

  2工程概况及特点 ........................................................................................................ 7

  2.1工程概况 ........................................................................................................................... 7

  2. 2结构特点: ...................................................................................................................... 8

  3施工部署 .................................................................................................................... 9

  施工准备工作.............................................................................................................. 11

  4.1项目机构组建和组成人员 .............................................................................................. 11

  4.2 项目部主要组成人员及职责 ....................................................................................... 11

  4.2 技术准备 ........................................................................................................................ 21

  4.3 施工现场准备................................................................................................................. 21

  6.2.2 基础施工 ......................................................................................... 28

  6.2.3地下室结构施工............................................................................... 28

  6.2.4 回填工程 ........................................................................................... 29

  6.3主体结构施工.................................................................................................................. 31

  6.3.1 混凝土施工 ....................................................................................... 31

  6.3.2 钢筋工程 ......................................................................................... 32

  6.3.3 模板工程 ......................................................................................... 34

  6.3.4砌体工程 ............................................................................................ 35

  6.3.5 脚手架 ............................................................................................... 36

  6.4 装修工程 ........................................................................................................................ 36

  6.4.1 内装修 ............................................................................................... 36

  6.4.2 外墙装修 ........................................................................................... 36

  6.4.3 门窗工程 ........................................................................................... 37

  6.4.4 屋面工程 ........................................................................................... 37

  6.5楼地面工程 ..................................................................................................................... 39

  6.5.1细石混凝土面层............................................................................... 39

  6.6 水暖工程 ........................................................................................................................ 40

  7 拟投入的主要物资 ............................................................................................... 41

  8 劳动力安排计划 ..................................................................................................... 41

  9 确保工程质量的技术组织措施 ............................................................................. 41

  9.1.1 质量管理目标 ................................................................................... 41

  9.1.2 质量管理方法 ................................................................................... 41

  9.1.3 生产会议和质量会议制度 ............................................................. 41

  9.1.4 对专业工程施工人员的技术资质审核 ......................................... 42

  9.1.5 坚持样板引路,先确认再大面积施工的方法 ............................. 42

  9.1.6 质量检验措施 ................................................................................... 42

  9.2 技术保证措施................................................................................................................. 43

  9.2.1组织保证、制度落实 ........................................................................ 43

  9.2.2做好技术交底工作 ............................................................................ 43

  9.2.3做好施工测量工作 ............................................................................ 44

  9.2.4 原材料质量保证措施 ....................................................................... 44

  9.3施工过程中的质量控制 .................................................................................................. 45

  9.3.1 基础工程施工质量保障 ................................................................. 45

  9.3.2 主体工程施工质量保障 ................................................................. 48

  9.3.3 装饰工程施工质量保障 ................................................................... 62

  9.3.4 门窗工程施工质量保障 ................................................................... 68

  10 确保文明施工的技术措施 ................................................................................. 69

  10.1文明施工体系................................................................................................................ 69

  10.2文明施工保证措施 ........................................................................................................ 70

  10.2.1现场文明施工措施 .......................................................................... 70

  10.2.2工地及生活住地卫生 ...................................................................... 70

  10.2.3文明施工内业资料 .......................................................................... 71

  10.2.4施工区域内现有市政管网和周围建、构筑物保护: .................. 71

  10.2.5现有卫生及安全保卫措施: .......................................................... 71

  10.2.6现场文明施工设计和标准 .............................................................. 72

  10.2.7文明施工宣传、教育保证 .............................................................. 73

  10.2.8行为规范保证 .................................................................................. 73

  10.3文物保护 ....................................................................................................................... 74

  11 工期保证措施 ....................................................................................................... 74

  11.1 组织成员 ..................................................................................................................... 74 11.2

  11.3 技术保证 ................................................................................................................. 74

  材料保证 ................................................................................................................. 75

  11.4 制度保证 ..................................................................................................................... 75

  12施工现场安全管理措施 ........................................................................................ 75

  12.1 组织制度保证 ......................................................................................................... 75

  12.2 技术措施 ...................................................................................................................... 76

  12.2.1 架体支护 ......................................................................................... 76

  12.2.2 模板工程 ......................................................................................... 76

  12.2.4安防措施 .......................................................................................... 77

  12.3 高处作业 ...................................................................................................................... 77

  12.4 交叉施工 ...................................................................................................................... 78

  12.5 施工机具、塔吊安全防护 ........................................................................................... 78

  13 环境保护措施 ....................................................................................................... 79

  13.1噪音控制措施............................................................................................................... 79

  13.1.1施工生产噪声控制......................................................................... 79

  13.1.2主要施工机械噪声控制................................................................. 80

  13.2控制扬尘及大气污染措施 ........................................................................................... 81

  13.2.1扬尘(大气)控制依据及限值..................................................... 81

  13.2.2施工现场扬尘(大气)控制措施................................................. 81

  13.3水污染控制措施 ........................................................................................................... 82

  13.3.1施工区现场水污染控制................................................................. 82

  13.3.2生活水污染控制............................................................................. 83

  13.4装饰施工环保措施 ....................................................................................................... 83

  13.4.1材料要求......................................................................................... 83

  13.4.2材料进场检验................................................................................. 84

  13.4.3施工要求......................................................................................... 84

  14 季节性施工措施 ................................................................................................... 85

  14.1夏季施工措施................................................................................................................ 85

  14.1.1保健措施 .......................................................................................... 85

  14.1.2准备工作 .......................................................................................... 85

  14.2冬季施工措施................................................................................................................ 88

  14.2.1冬季施工目标 .................................................................................. 88

  14.2.2冬季施工准备工作 .......................................................................... 88

  14.2.3冬季施工管理 .................................................................................. 88

  14.3雨季施工措施................................................................................................................ 90

  14.3.1雨季施工管理目标 .......................................................................... 90

  14.3.2雨季施工准备工作 .......................................................................... 90

  14.3.3雨季施工管理 .................................................................................. 91

  篇二:工程造价专业毕业设计

  摘要

  毕业设计是根据金穗花园8#住宅楼工程的招标文件的招标须知、合同条件、技术规范、图纸、勘察结果及其它有关文件编制的投标书。

  设计包括:商务标、技术标和结论。商务标包括编制的依据、范围、工程量计算过程及总说明、工程造价的确定和工料分析;工程量计算规则按照《山东省建筑工程清单计价》中的计算规则计算,工程造价则是应用定额套价,采用以人工费为计算基础的计价程序,反算出工程造价。技术标则包括工程概况、施工组织及部署、施工前的准备、施工平面布置、各项管理措施、设计方案的优化及降低成本的措施。技术标是从人、材、机方面进行施工布置,从技术、施工、物资等方面采取措施来确保工程进度、工程质量和施工安全,并在此基础上降低成本。

  关键词:标书;商务标;技术标;工程量;施工方

  Abstract

  Graduation Jinsui Garden design is based on 8 # residential buildings, tender documents for tender information, contract conditions, technical specifications, drawings,survey results and other relevant tender documentation. Design includes: Business Standard, technical standard and conclusions. Business Standard, including the preparation of the basis for the scope of the project and the total amount of calculation shows that the project cost analysis to identify and quantity; engineering calculation in accordance with the rules, "a list of pricing works in Shandong Province," the rules of calculation, the project cost is the application of fixed sets of prices, the use of labor is calculated on the basis of valuation procedures, anti-calculated project cost. Technology Overview superscript engineering, construction and deployment of pre-construction preparation, construction layout, and all management measures, design optimization and cost reduction measures. Technical objective is from the people, material, machine layout aspects of construction, from a technical, construction, material, etc. to take measures to ensure the progress of the project, engineering quality and construction safety, and on this basis to reduce costs.

  KEY WORDS: tender; Business Standard; technical standard; engineering; construction program

  目 录

  摘要 .............................................................. I Abstract ......................................................... II

  上篇 商务标部分 ................................................... 1

  第1章 总论 ....................................................... 2

  1.1 投标总价 .................................................... 2

  1.2 总说明 ...................................................... 3

  1.3 工程项目投标报价汇总表 ...................................... 4

  1.4 单项工程费汇总表 ............................................ 5

  第2章 土建部分 ................................................... 6

  2.1 分部分项工程量清单与计价表 .................................. 6

  2.2 分部分项工程量清单综合单价分析表 ........................... 10

  2.3 措施项项目清单计价表(一) ................................. 52

  2.4措施项项目清单计价表(二).................................. 53

  2.5 规费税金项目清单与计价表 ................................... 54

  第3章 装饰部分 .................................................. 55

  3.1 分部分项工程量与清单计价表 ................................. 55

  3.2工程量清单综合单价分析表.................................... 57

  3.3 措施项项目清单计价表(一) ................................. 68

  3.4 措施项项目清单计价表(二) ................................. 69

  3.5 规费 税金项目清单与计价表 .................................. 70

  下篇 技术标部分 .................................................. 71

  第1章 工程概况 .................................................. 72

  第2章 施工准备工作计划 .......................................... 73

  2.1 施工总平面布置 ............................................. 73

  2.2 施工用水 ................................................... 73

  2.3 施工用电 ................................................... 73

  2.4 技术准备 ................................................... 73

  2.4.1 做好图纸会审工作...................................... 73

  2.4.2 制定专项施工方案...................................... 74

  2.4.3 放样.................................................. 74

  2.4.5 准备工作.............................................. 74

  第3章 施工总体布置和组织管理机构 ................................ 75

  3.1 组织机构 ................................................... 75

  3.1.1 管理模式.............................................. 75

  3.2 管理人员职责 ............................................... 76

  3.3 施工总平面布置 ............................................. 77

  3.4 施工现场总平面布置 ......................................... 78

  3.5 施工队伍(劳动力)的配置 ................................... 78

  3.6 材料、构配件、设备的配置 ................................... 78

  3.7 施工机具、设备的配置 ....................................... 78

  第4章 施工方案 .................................................. 79

  4.1 总体施工部署 ............................................... 79

  4.2 施工组织上必须遵循原则 ..................................... 79

  4.2.1 施工顺序先基础后主体.................................. 79

  4.2.2 充分做好各项准备工作和计划工作........................ 79

  4.2.3 充分利用好时间和空间.................................. 79

  4.2.4 确保人材机械机具的供应................................ 79

  4.2.5 严格执行现行的有关规范、标准、设计文件................ 79

  第5章 主要工程项目的施工程序和施工方法 .......................... 80

  5.1 施工顺序 ................................................... 80

  5.2 施工定位、测量放线 ......................................... 80

  5.2.1 设置测量控制网........................................ 80

  5.2.2 竖向(垂直度)控制.................................... 80

  5.2.3 平面位置控制.......................................... 80

  5.3地基与基础工程.............................................. 80

  5.3.1 土方开挖.............................................. 80

  5.3.2 基础工程.............................................. 81

  5.4 模板工程 ................................................... 81

  5.4.1 模板的选用............................................ 81

  5.4.2 各类构件模板的`支设.................................... 81

  5.4.3 模板支设的技术措施及质量标准.......................... 81

  5.4.4 模板的拆除............................................ 81

  5.5 混凝土工程 ................................................. 81

  5.5.1 原材料质量要求........................................ 81

  5.5.2 搅拌和运输要求........................................ 82

  5.5.3 浇注成型.............................................. 82

  5.5.4 砼养护................................................ 83

  5.6 钢筋工程 ................................................... 83

  5.6.1 原材料质量标准........................................ 83

  5.6.2 钢筋及半成品的存放.................................... 83

  5.6.3 钢筋的加工制作........................................ 83

  5.7 结构墙体砌筑 ............................................... 84

  5.7.1 材料要求.............................................. 84

  5.7.2 砌体施工的技术措施.................................... 84

  5.7.3 砌体质量要求.......................................... 85

  5.8 脚手架工程 ................................................. 85

  5.8.1 脚手架构架和设置要求.................................. 85

  5.8.2 脚手架的搭设.......................................... 85

  5.8.3 脚手板或其它作业层板铺板的铺设........................ 85

  5.8.4 脚手架搭设质量控制.................................... 86

  5.8.5 脚手架的使用注意事项.................................. 86

  5.8.6 脚手架的拆除.......................................... 87

  5.9 屋面工程 ................................................... 87

  5.9.1 平屋面做法............................................ 88

  5.9.2 施工要点.............................................. 88

  5.10 装饰装修工程 .............................................. 88

  5.10.1外墙抹灰 ............................................. 88

  5.10.2 内墙抹灰............................................. 89

  5.10.3 外墙涂料工程......................................... 89

  5.10.4 铺地砖楼(地)面..................................... 89

  5.10.5 抹灰工程............................................. 89

  5.10.6 乳胶漆顶棚........................................... 90

  第6章 工程施工计划 .............................................. 91

  6.1 施工进度计划 ............................................... 91

  6.2 关键工序的进度控制点 ....................................... 91

  6.3 投入本工程的主要施工机械设备 ............................... 91

  6.4 材料设备需用计划 ........................................... 93

  6.5 劳动力需用计划 ............................................. 95

  第7章 质量目标及保证措施 ........................................ 96

  7.2 保证措施 ................................................... 96

  篇三:工程造价毕业设计

  摘要

  招标文件是招标人向供应商或承包商发出的,旨在向其提供为编写投标文件所需的资料并向其通报招标投标将依据的规则和程序等项内容的书面文件。本次毕业设计为兖州幸福之家小区A5住宅楼招标文件,主要包括致投标人、投标须知、合同条款、招标控制价等四部分构成,通过对工程量的计算、工程造价的计算及招标文件的编写,熟悉工程造价的形成过程,掌握招投标方面的知识。

  本工程招标控制价采用工程量清单计价模式,它是建设工程招投标中与定额计价相区别的一种计价方式,也是目前采用的主流方式,由分部分项工程量清单、措施项目清单、规费和税金、其他项目清单组成。由于工程量清单计价是自主确定工料机消耗量和自主确定工料机单价,使得其清单工程量与计价工程量相分离,使得其报价具有市场价格的本质特征。

  关键词:招标文件;工程量清单计价;合同条款;招标控制价

  Abstract

  The tender documents are issued by tender to suppliers or contractors designed to provide the information required for the preparation of tender documents and the written document of informed bidding in accordance with the rules and procedures etc..The graduation project for the home district of Yanzhou happiness A5 residential building tender documents, including that caused by the bidders, tender notes, the terms of the contract price of tender control composed of four parts of quantity survey, project cost calculations and tender documentspreparation are familiar with the formation process of the project cost, to master the knowledge of the bidding.

  Control the price of the tender of the project using a Bill of Quantities mode, it is a mainstream form of construction project bidding with a fixed difference between valuation relative to pricing, is currently used by the bill of quantities of the part of the project, list of action items, regulationsfees and taxes, the list of items. As the bill of quantities is independent determine Quantity machine consumption and independently determine the quantity machine unit price, phase separation, making its offer to the market price of the essential characteristics of its list of quantities and pricing of quantities.

  Key word: Tender document ; Resilience detailed list valuation ; Terms of the contract ;Tender control price

  目录

  1 致投标人??????????????????????1 2 投标须知??????????????????????3

  2.1 投标须知前附表???????????????????3

  2.11投标须知前附表1??????????????????3

  2.12投标须知前附表2??????????????????4

  2.13投标须知前附件???????????????????5 附件1:建设工程施工招标公告??????????????5 附件2:投标文件否决性条款摘要?????????????7 附件3: 评标方法????????????????????9 附件4:资格后审程序??????????????????14

  2.2 投标须知??????????????????????16

  2.21总则????????????????????????16

  2.22招标文件??????????????????????17

  2.23投标文件的编制???????????????????19

  2.24投标文件的提交???????????????????24

  2.25资格后审??????????????????????25

  2.26开标????????????????????????25

  2.27评标????????????????????????27

  2.28中标通知书?????????????????????33

  2.29合同的授予?????????????????????33 3 合同条款???????????????????????35

  3.1 通用条款???????????????????????35

  3.2 专用条款???????????????????????35

  附件:工程质量保修书????????????··???????44 4

  招标控制价 ??????????????????????47 封面 ??????????????????????????48

  4.2 总说明 ?????????????????????????49

  4.3 单位工程招标控制价汇总表 ????????????????50

  4.4 分部分项工程量清单计价表????????·????????58

  4.5 工程量清单综合单价分析表???????·?????????100

  4.6 措施项目清单计价表??????????·?????????101

  4.7 其他项目清单计价汇总表?????????????????102

  4.8规费、税金项目清单计价表 ????????????????104

  参考文献: 105 致谢辞106 附录1:黑白合同漫谈107 附录2:清单工程量计算书116

  特别提示:

  一、本招标文件是依据有关招标投标的法律、法规、规章和规范性文件的规定,根据本招标工程的特点和需要编制的。招标文件的编制遵循公开、公平、公正和诚实信用的原则,招标文件的内容已清楚地反映了工程的规模、性质以及商务和技术要求等。

  二、投标人获取招标文件后,应仔细阅读招标文件及附件的全部内容,招标文件与附件具有同等效力。

  三、投标人在投标截止时间前,招标人对已发出的招标文件进行的澄清或修改会在市建设工程交易中心网站公布。招标文件、答疑、补遗内容不一致时,以最后发出的为准。

  四、投标人应在遵循招标文件的各项规定和要求的前提下,编制投标文件。编制投标文件时,应注意:

  1.投标文件必须满足招标文件中的实质性要求和条件。投标文件的所有否决性条款已在“投标须知前附件三”中汇总明示,若出现其中任何一个情形的,其投标将会被否决。

  2.投标人对招标文件有不同意见或不明之处,应以不记名方式在市建设工程交易中心网站向招标人质疑,求得彻底澄清。若招标人不接受投标人提出的意见,投标人必须按招标文件办理,而不应在投标文件中加进额外的条件。

  五、投标人在提交投标文件时,应注意:

  1.投标人应严格按照招标文件的要求进行投标文件的密封、装订和标记。

  2.投标人应当在招标文件要求提交投标文件的截止时间前,将投标文件送达指定地点。