英文合同

时间:2023-05-05 13:44:26 合同范本 我要投稿

关于英文合同合集五篇

  在人民愈发重视法律的社会中,合同对我们的约束力越来越不可忽视,签订合同也是避免争端的最好方式之一。那么大家知道合同的格式吗?下面是小编为大家整理的英文合同5篇,希望能够帮助到大家。

关于英文合同合集五篇

英文合同 篇1

  合 同 CONTRACT

  日期: 合同号码:

  Date: Contract No.:

  买 方: (The Buyers)

  Address/TEL/FAX/E-mail

  卖方: (The Sellers)

  Address/TEL/FAX/E-mail

  本合同双方,公司(以下称甲方)与(以下称乙方), 在平等互利基础上,通过友好协商,于 某年某月某日在中国(地址),特签订本合同

  This contract is hereby (特此) made and concluded by and between co.,(hereinafter referred to as party A) and Co.,(hereinafter referred to as party B) on (date),in (place), china, on the principle of equality and mutual benefit and through amicable(friendly) consultation 双方有争议,应首先通过友好协商解决

  All disputes arising from the execution of this agreement shall be settled through friendly consultations

  兹经买卖双方同意按照以下条款由买方购进,卖方售出以下商品:

  This contract is made by the Buyers and the Sellers; whereby the Buyers agree tobuy and the Sellers agree to sell the following goods subject to the terms and conditions as stipulated follow:

  (1) 商品名称、规格、质量Name of Commodity、specifications quality of commodity

  (2) 数 量:Quantity:允许----的溢短装 ---% more or less allowed

  (3) 单 价: Unit price:

  (4) 总 值:Total Value/ Total Amount

  (5) 包 装:Packing:

  货物应具有防潮、防锈蚀、防震并适用于海洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不退色的颜色标明尺码、包装箱、毛重、净重、及“此端向上”“防潮”、“小心轻放”易碎fragile 等标记。

  The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock,( The packing of the goods must be well protected against dampness, moisture, rust, and be able to stand shock) and shall be suitable for ocean transportation/multiple transportation. The seller shall be liable for all damage and losses of the goods attributable to (caused by)the inadequate orimproper packing. The measurement , gross weight, net weight and the cautions such as “do not stack up side down”(this way up)”keep away from moisture” “handle with care”shall be stenciled (marked)on the surface of each package with fadeless pigment.

  (6) 生产国别:Country of Origin :

  (7) 支付条款:Terms of Payment:L/C、D/P、D/A、COD(cash on delivery)

  () 信用证式:买应在装运期前/合同生效后__日,开出以卖为受益人的不可撤销的议付信用证,信用证在装船完毕后__日内到期。

  Letter of Credit: The Buyer shall, ______ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire ____ days after the completion of loading of the shipment as stipulated.

  () 付款交单:货物发运后,卖方出具以买方为付款人的'付款跟单汇票,按即期付款交单(D/P)式,通过卖银行及_____银行向买转交单证,换取货物。

  Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and ______ Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.

  即期付款交单D/P at sight

  跟单汇票documentary draft

  Upon first presentation the Buyer shall pay against documentary draft drawn by the Seller at sight. The Shipping documents are to be delivered against payment only.

  买方应凭卖方开具的即期跟单汇票于见票时立即付款,付款后交单。

  () 承兑交单:货物发运后,卖出具以买为付款人的付款跟单汇票,付款期限为____后__日,按即期承兑交单(D/A__日)式,通过卖银行及______银行,经买承兑后,向买转交单证,买在汇票期限到期时支付货款。

  Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable_____ days after the Buyers delivers the document through Seller’s bank and _________Bank to the Buyer against

  acceptance (D/A ___ days). The Buyer shall make the payment on date of the bill of exchange.

  () 货到付款:买在收到货物后__天内将全部货款支付卖(不适用于FOB、CRF、CIF术语)。

  Cash on delivery (COD): The Buyer shall pay to the Seller total amount within ______ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF).

  (8) 保 险:insurance:由----按发票金额110%投保--- 险和---附加险

  Insurance shall be covered by the ----for 110% of the invoice value against-----risks and additional risks

  (9) 装运期限: Time of Shipment:

  (10) 起 运 港:Port of Lading:

  (11) 目 的 港: Port of Destination:

  单据(Documents Required):

  卖应将下列单据提交银行议付/托收:

  The Seller shall present the following documents required to the bank for negotiation/collection:

  () 标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。

  Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;

  () 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式__份;

  Signed commercial invoice in ______copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;

  () 由______出具的装箱或重量单一式__份;

  Packing list/weight memo in ______ copies issued by__;

  () 由______出具的质量证明书一式__份;

  Certificate of Quality in _______ c(转载于:www.773N.co m校 园生活 网:合同号码英文)opies issued by____;

  () 由______出具的数量证明书一式__份;

  Certificate of Quantity in ___ copies issued by____;

  () 保险单本一式__份(CIF 交货条件);

  Insurance policy/certificate in ___ copies (Terms of CIF);

  ()____签发的产地证一式__份;

  Certificate of Origin in ___ copies issued by____;

  () 装运通知(Shipping advice): 卖应在交运后_____小时内以特快专递式邮寄给买上述第__项单据副本一式一套。

  EMS邮政特快专递

  The Seller shall, within ____ hours after shipment effected, send by courier each copy of the above-mentioned documents No. __.

  一式两份:in duplicate; 一式三份:in triplicate;一式四份:in

  quadruplicate

  The fax contract has same force as effect as origin form

  本合同传真件具有法律效力

  运输方式:terms of delivery FOB/CFR/CIF

  () FOB交货式

  卖方应在合同规定的装运日期前天,以____式通知买合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买安排租船/订舱。装运船只按期到达装运港后,如卖不能按时装船,发生的空船费或滞期费由卖负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

  The Seller shall, days before the shipment date specified in the Contract, advise the Buyer by _______ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of(in case) the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus

英文合同 篇2

  Contract for Equipment Sales and Technology Licensing

  Contract No. ____________________

  This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at _________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at _________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).

  Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:

  Article 1 Definitions

  1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.

  1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.

  1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.

  1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.

  1.5 “Destination Airport” refers to _____________Airport.

  1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.

  1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.

  1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.

  1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.

  1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.

  1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.

  1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.

  1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.

  1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.

  1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.

  1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.

  1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.

  1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.

  1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.

  Article 2 Scope of the Contract

  2.1 The Seller’s Obligation

  2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.

  2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.

  2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.

  2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.

  2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.

  2.2 The Buyer’s Obligation

  2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.

  2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.

  2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.

  2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.

  2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.

  2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.

  Article 3 Grant of License

  3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.

  3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

  (Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

  3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.

  3.4 Territory

  3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.

  3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.

  Article 4 Price

  4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.

  4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).

  The breakdown price is as follows:

  The price for Equipment is __________(say _______________________ only).

  Fee for design is __________(say _______________________ only).

  Fee for Technical Documentations is __________(say _______________________ only).

  License fee is __________________(Say: _________________ only)

  4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 20xx, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).

  4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.

  4.2.3 The above price is fixed and firm.

  4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.

  4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.

  Article 5 Payment

  5.1 Down Payment

  Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.

  ......................The Beginning of Option.......................

  5.2 [Option One: Payment by Sight L/C]

  The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).

  5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

  (a) Bill of Lading in one (1) original and ___ ( ) copies;

  (b) Commercial Invoice in one (1) original and ___ ( ) copies;

  (c) Packing list in one (1) original and ___ ( ) copies;

  (d) Certificate of Origin in one (1) original and ___ ( ) copies;

  (e) Insurance Policy in one (1) original and ___ ( ) copies;

  5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

  (a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;

  (b)One ( 1 ) copy of commercial invoice.

  5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

  a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;

  b) One (1) copy of Commercial Invoice.

  5.2 [Option Two: Payment under a L/G]

  The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.

  ......................The End of Option.......................

  5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.

  Article 6 Delivery of Equipment and Technical Documentation

  6.1 The Delivery of the Equipment

  6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.

  6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.

  Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.

  6.1.3 The port of shipment is ____, while the port of destination is ____.

  6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.

  6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.

  6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:

  (a) Contract number

  (b) Name of the vessel and loading port

  (c) Name of the Equipment shipped

  (d) Number and date of Bill of Lading

  (e) Total volume

  (f) Total gross and net weight

  (g) Total number of packages/cases

  6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:

  (a) Bill of Lading

  (b) Commercial Invoice

  (c) Packing List

  (d) Certificate of Origin

  (e) Insurance Policy.

  6.2 The Late Delivery of the Equipment

  6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:

  (a) From the first week to the fourth week, the liquidated damages shall be

  ____ ( ) percent of the value of the delayed portion of the Equipment per

  week

  (b) From the fifth week to the eighth week, the liquidated damages shall be

  ____ ( ) percent of the value of the delayed portion of the Equipment per week

  (c) From the ninth week, the liquidated damages shall be ____ ( ) percent of

  the value of the delayed portion of the Equipment per week

  6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.

  6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.

  6.3 The Delivery of the Technical Documentation

  6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.

  6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.

  6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.

英文合同 篇3

  purchase contract

  特别提示:

  (1)斟酌后才勾画所适用的条款,附加条款应写清。

  (2)应有专人负责交易的全过程及处理相关的事务。

  (3)收、发的文件仔细斟酌和妥善保存。

  (4)不要超越商检、索赔期限,以免丧失主张权利的时机。

  (5)及时行使撤销权和不安抗辩权,并通知对方。

  合同编号 (contract no.):_______

  签订日期 (date):__________

  签订地点 (signed at):_________

  买方:____________________________

  the buyer:_________________________

  地址:____________________________

  address: __________________________

  电话(tel):________传真(fax):____________

  电子邮箱(e-mail):______________________

  卖方:____________________________

  the seller:_________________________

  地址:____________________________

  address: __________________________

  电话(tel):________传真(fax):____________

  电子邮箱(e-mail):______________________

  买卖双方同意按照下列条款签订本合同:

  the seller and the buyer agree to conclude this contract subject to the terms and conditions stated below:

  1. 货物名称、规格和质量(name, specifications and quality of commodity):

  2. 数量(quantity):

  允许____的溢短装(___%more or less allowed)

  3. 单价(unit price):

  4. 总值(total amount):

  5. 交货条件(terms of delivery):fob/cfr/cif_______

  6. 原产地国与制造商(country of origin and manufacturers):

  7. 包装及标准(packing):

  货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。

  the packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. the seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. the measurement, gross weight, net weight and the cautions such as "do not stack up side down", "keep away from moisture", "handle with care" shall be stenciled on the su***ce of each package with fadeless pigment.

  8. 唛头(shipping marks):

  9. 装运期限(time of shipment):

  10. 装运口岸(port of loading):

  11. 目的口岸(port of destination):

  12. 保险(insurance):

  由____按发票金额110%投保_____险和_____附加险。

  insurance shall be covered by the ____for 110% of the invoice value against ______risks and _______additional risks.

  13. 付款条件(terms of payment):

  (1) 信用证方式:买方应在装运期前/合同生效后__日,开出以卖方为受益人的不可撤销的议付信用证,信用证在装船完毕后__日内到期。

  letter of credit: the buyer shall in ______days prior to the time of shipment /after this contract comes into effect, open an irrevocable letter of credit in favor of the seller. the letter of credit shall expire ____days after the completion of loading of the shipment as stipulated.

  (2) 付款交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(d/p)方式,通过卖方银行及_____银行向买方转交单证,换取货物。

  documents against payment: after shipment, the seller shall draw a sight bill of exchange on the buyer and deliver the documents through sellers bank and ______bank to the buyer against payment, i.e d/p. the buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.

  (3) 承兑交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,付款期限为_____后__日,按即期承兑交单(d/a __日)方式,通过卖方银行及 银行,经买方承兑后,向买方转交单证,买方在汇票期限到期时支付货款。

  documents against acceptance: after shipment, the seller shall draw a sight bill of exchange, payable _____days after the buyers delivers the documents through sellers bank and ________bank to the buyer against acceptance(d/a _____days).the buyer shall make the payment on date of the bill of exchange.

  (4) 货到付款:买方在收到货物后__天内将全部货款支付卖方(不适用于fob、crf、cif术语)。

  cash on delivery (cod): the buyer shall pay to the seller total amount within _______days after the receipt of the goods (this clause is not applied to the terms of fob,cfr,cif).

  14. 单据(documents required):

  卖方应将下列单据提交银行议付/托收:

  the seller shall present the following documents required to the bank for negotiation/collection:

  (1) 标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。

  full set of clean on board ocean/combined transportation/land bills of lading and blank endorsed marked freight prepaid/ to collect;

  (2) 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式__份;

  signed commercial invoice in ______copies indicating contract no., l/c no. (terms of l/c) and shipping marks;

  (3) 由______出具的装箱或重量单一式__份;

  packing list/weight memo in _______copies issued by__;

  (4) 由______出具的质量证明书一式__份;

  certificate of quality in _______copies issued by____;

  (5) 由______出具的数量证明书一式__份;

  certificate of quantity in _______copies issued by____;

  (6) 保险单正本一式__份(cif 交货条件);

  insurance policy/certificate in _______copies (terms of cif);

  (7)____签发的产地证一式__份;

  certificate of origin in _________copies issued by____;

  (8) 装运通知(shipping advice): 卖方应在交运后_____ 小时内以特快专递方式邮寄给买方上述第__项单据副本一式一套。

  the seller shall, within ____hours after shipment effected, send by courier each copy of the above-mentioned documents no. __.

  15. 装运条款(terms of shipment):

  (1) fob交货方式

  卖方应在合同规定的装运日期前30天,以____方式通知买方合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买方安排租船/订舱。装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

  the seller shall, 30 days before the shipment date specified in the contract, advise the buyer by _______of the contract no., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the buyer can charter a vessel/book shipping space. in the event of the seller‘s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the seller‘s account.

  (2) cif或cfr交货方式

  卖方须按时在装运期限内将货物由装运港装船至目的港。在cfr术语下,卖方应在装船前2天以____方式通知买方合同号、品名、发票价值及开船日期,以便买方安排保险。

  the seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. under cfr terms, the seller shall advise the buyer by _________of the contract no., commodity, invoice value and the date of dispatch two days before the shipment for the buyer to arrange insurance in time.

  16. 装运通知(shipping advice):

  一俟装载完毕,卖方应在__小时内以____方式通知买方合同编号、品名、已发运数量、发票总金额、毛重、船名/车/机号及启程日期等。

  the seller shall, immediately upon the completion of the loading of the goods, advise the buyer of the contract no., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _________ within ________hours.

  17. 质量保证(quality guarantee):

  货物品质规格必须符合本合同及质量保证书之规定,品质保证期为货到目的港__个月内。在保证期限内,因制造厂商在设计制造过程中的缺陷造成的货物损害应由卖方负责赔偿。

  the seller shall guarantee that the commodity must be in conformity with the quality, specifications and quantity specified in this contract and letter of quality guarantee. the guarantee period shall be ______months after the arrival of the goods at the port of destination, and during the period the seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.

  18. 检验(inspection)(以下两项任选一项):

  (1)卖方须在装运前__日委托______检验机构对本合同之货物进行检验并出具检验证书,货到目的港后,由买方委托________检验机构进行检验。

  the seller shall have the goods inspected by ______days before the shipment and have the inspection certificate issued by____. the buyer may have the goods reinspected by ________ after the goods arrival at the destination.

  (2) 发货前,制造厂应对货物的质量、规格、性能和数量/重量作精密全面的检验,出具检验证明书,并说明检验的技术数据和结论。货到目的港后,买方将申请中国商品检验局(以下简称商检局)对货物的规格和数量/重量进行检验,如发现货物残损或规格、数量与合同规定不符,除保险公司或轮船公司的责任外,买方得在货物到达目的港后__日内凭商检局出具的检验证书向卖方索赔或拒收该货。在保证期内,如货物由于设计或制造上的缺陷而发生损坏或品质和性能与合同规定不符时,买方将委托中国商检局进行检验。

  the manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. after arrival of the goods at the port of destination, the buyer shall apply to china commodity inspection bureau (hereinafter referred to as ccib) for a further inspection as to the specifications and quantity/weight of the goods. if damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this contract, except when the responsibilities lies with insurance company or shipping company, the buyer shall, within _____days after arrival of the goods at the port of destination, claim against the seller, or reject the goods according to the inspection certificate issued by ccib. in case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the contract, the buyer shall, during the guarantee period, request ccib to make a survey.

  19. 索赔(claim):

  买方凭其委托的检验机构出具的检验证明书向卖方提出索赔(包括换货),由此引起的全部费用应由卖方负担。若卖方收到上述索赔后______天未予答复,则认为卖方已接受买方索赔。

  the buyer shall make a claim against the seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred thereafter shall be borne by the seller. the claims mentioned above shall be regarded as being accepted if the seller fail to reply within ______days after the seller received the buyer’s claim.

  20. 迟交货与罚款(late delivery and penalty):

  除合同第21条不可抗力原因外,如卖方不能按合同规定的'时间交货,买方应同意在卖方支付罚款的条件下延期交货。罚款可由议付银行在议付货款时扣除,罚款率按每__天收__%,不足__天时以__天计算。但罚款不得超过迟交货物总价的____ %。如卖方延期交货超过合同规定__天时,买方有权撤销合同,此时,卖方仍应不迟延地按上述规定向买方支付罚款。

  买方有权对因此遭受的其它损失向卖方提出索赔。

  should the seller fail to make delivery on time as stipulated in the contract, with the exception of force majeure causes specified in clause 21 of this contract, the buyer shall agree to postpone the delivery on the condition that the seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. the rate of penalty is charged at______% for every ______days, odd days less than _____days should be counted as ______days. but the penalty, however, shall not exceed_______% of the total value of the goods involved in the delayed delivery. in case the seller fail to make delivery ______days later than the time of shipment stipulated in the contract, the buyer shall have the right to cancel the contract and the seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the buyer without delay.

  the buyer shall have the right to lodge a claim against the seller for the losses sustained if any.

  21. 不可抗力(force majeure):

  凡在制造或装船运输过程中,因不可抗力致使卖方不能或推迟交货时,卖方不负责任。在发生上述情况时,卖方应立即通知买方,并在__天内,给买方特快专递一份由政府主管当局签发的事故证明书。在此情况下,卖方仍有责任采取一切必要措施加快交货。如事故延续__天以上,买方有权撤销合同。

  the seller shall not be responsible for the delay of shipment or non-delivery of the goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. the seller shall advise the buyer immediately of the occurrence mentioned above and within_____ days thereafter the seller shall send a notice by courier to the buyer for their acceptance of a certificate of the accident issued by the competent government authorities under whose jurisdiction the accident occurs as evidence thereof. under such circumstances the seller, however,are still under the obligation to take all necessary measures to hasten the delivery of the goods. in case the accident lasts for more than _____days the buyer shall have the right to cancel the contract.

  22. 争议的解决 (arbitration):

  凡因本合同引起的或与本合同有关的任何争议应协商解决。若协商不成,应提交中国国际经济贸易仲裁委员会,按照申请时该会当时施行的仲裁规则进行仲裁,仲裁地点在中国深圳。仲裁裁决是终局的,对双方均有约束力。

  any dispute arising from or in connection with the contract shall be settled through friendly negotiation. in case no settlement is reached, the dispute shall be submitted to china international economic and trade arbitration commission(cietac), for arbitration in accordance with its rules in effect at the time of applying for arbitration. the place of arbitration is in ____, china. the arbitral award is final and binding upon both parties.

  23. 通知(notices):

  所有通知用____文写成,并按照如下地址用传真/快件送达给各方。如果地址有变更,一方应在变更后__日内书面通知另一方。

  all notice shall be written in _____ and served to both parties by fax/courier according to the following addresses. if any changes of the addresses occur, one party shall inform the other party of the change of address within ____days after the change.

  24. 本合同使用的fob、cfr、cif术语系根据国际商会《国际贸易术语解释通则》。

  the terms in the contract are based on incoterms 1990 of the international chamber of commerce.

  25. 附加条款(additional clause):

  本合同上述条款与本附加条款抵触时,以本附加条款为准。

  conflicts between contract clause here above and this additional clause, if any, it is subject to this additional clause.

  26. 本合同用中英文两种文写成,两种文具有同等效力。本合同共__份,自双方代表签(盖章)之日起生效。

  this contract is executed in two counterparts each in chinese and english, each of which shall deemed equally authentic. this contract is in ______copies, effective since being signed/sealed by both parties.

  买方代表人(签):

  representative of the buyer

  (authorized signature):

  卖方代表人(签):

  representative of the seller

  (authorized signature):

  联系方式:

英文合同 篇4

  Three-party Property Sales & Purchase Agreement

  甲 方 (卖方): Party A (Seller): _______________________________ 乙 方 (买方): Party B (Buyer): _______________________________ 丙方(居间方):北京安信瑞德房地产经纪有限公司 店

  Party C (Agent): Beijing Anxiuide Real Estate Brokerage Co. Ltd.

  Office

  合同编号:S-34-700000

  编号:____________

  Agreement No.: S-34-700000

  温馨提示:

  尊敬的客户,您好!欢迎您成为21世纪中国不动产客户大家庭中的一员,能为您提供服务,我们感到非常荣幸!为了维护您的.权益,当您向本公司支付任何一笔款项时,务必要求我公司业务人员提供盖有本公司印章或财务章的收据或发票,以此确认本公司收到该款项,否则,本公司不予认可。

  Dear customer,

  Thank you for choosing Century21 China Real Estate. It is our honor to provide you with our services!

  For your interest, please claim payment receipt or invoice with our company’s chop from your agent when you make any payment to our company.

  您的成交委托协议编号:

  The serial number of your entrustment agreement :______________________________

  咨询电话:65610088-124 全国统一客服电话:400-650-8821

  Customer Hotline in Beijing: 65610088—124

  Nationwide Customer Service Hotline: 4006-50-8821

  每家加盟店独立拥有和运营

  Three-party Property Sales & Purchase Agreement

英文合同 篇5

  合同号:_________

  no:_________

  日期:_________

  date:_________

  为在平等互利的基础上发展贸易,有关方按下列条件签订本协议:

  this agreement is entered into between the parties concerned on the basis of equality and mutual benefit to develop bussiness on terms and conditions mutually agreed upon as follows:

  1.订约人

  contracting parties

  供货人(以下称甲方):_________

  supplier(hereinafter called “party a”):_________

  销售代理人(以下称乙方):_________

  agent(hereinafter called “party b”):_________

  甲方委托乙方为销售代理人,推销下列商品。

  party a hereby appoint party b to act as his selling agent to sell the commodity mentioned below.

  2.商品名称及数量或金额

  commodity and quantity or amount

  双方约定,乙方在协议有效期内, 销售不少于_________的商品。

  it is mutually agreed that party b shall undertake to sell not less than _________ of the aforesaid commodity in the duration of this agreement。

  3.经销地区

  territory

  只限在_________。

  in _________ only.

  4.订单的确认

  confirmation of orders

  本协议所规定商品的数量、价格及装运条件等,应在每笔交易中确认,其细目应在双方签订的销售协议书中作出规定。

  the quantities, prices and shipments of the commodities stated in this agreement shall be confirmed in each transaction, the particulars of which are to be specified in the sales confirmation signed by the two parties hereto.

  5.付款

  payment

  订单确认之后,乙方须按照有关确认书所规定的时间开立以甲方为受益人的保兑的、不可撤销的即期信用证。乙方开出信用证后,应立即通知甲方,以便甲方准备交货。

  after confirmation of the order, party b shall arrange to open a confirmed, irrevocable l/c available by draft at sight in favour of party a within the time stipulated in the relevant s/c. party b shall also notify party a immediately after l/c is opened so that party a can get prepared for delivery.

  6.佣金

  commission

  在本协议期满时,若乙方完成了第二款所规定的数额,甲方应按装运货物所收到的发票累计总金额付给乙方_________%的佣金。

  upon the expiration of the agreement and party b's fullfilment of the total turnover mentioned in article 2, party a shall pay to party b _________% commission on the basis of the aggregate amount of the invoice value against the shipments effected.

  7.市场情况报告

  reports on market conditions

  乙方每3个月向甲方提供一次有关当时市场情况和用户意见的详细报告。同时,乙方应随时向甲方提供其他供应商的类似商品样品及其价格、销售情况和广告资料。

  party b shall forward once every three months to party a detailed reports on current market conditions and of consumers' comments. meanwhile, party b shall,from time to time, send to party a samples of similar commodities offered by other suppliers, together with their prices, sales information and advertising materials.

  8.宣传广告费用

  advertising & publicity expenses

  在本协议有效期内,乙方在上述经销地区所作广告宣传的一切费用,由乙方自理。乙方须事先向甲方提供宣传广告的图案及文字说明,由甲方审阅同意。

  party b shall bear all expenses for advertising and publicity within the aforementioned territory in the duration of this agreement and submit to party a all patterns and/or drawings and description for prior approval.

  9.协议有效期

  validity of agreement

  本协议经双方签字后生效,有效期为_________天,自_________至_________。若一方希望延长本协议,则须在本协议期满前1个月书面通知另一方,经双方协商决定。

  若协议一方未履行协议条款,另一方有权终止协议。

  this agreement, after its being signed by the parties concerned, shall remain in force for _________ days from _________ to _________ if either party wishes to extend this agreement, he shall notice, in writing, the other party one month prior to its expiration. the matter shall be decided by the agreement and by consent of the parties hereto. should either party fail to implement the terms and conditions herein, the other party is entitled to terminate this agreement.

  10.仲裁

  arbitration

  在履行协议过程中,如产生争议,双方应友好协商解决。若通过友好协商达不成协议,则提交中国国际贸易促进委员会对外贸易仲裁委员会,根据该会仲裁程序暂行规定进行仲裁。该委员会的决定是终局的,对双方均具有约束力。仲裁费用,除另有规定外,由败诉一方负担。

  all disputes arising from the execution of this agreement shall be settled through friendly consultations. in case no settlement can be reached, the case in dispute shall then be submitted to the foreign trade arbitration commission of the china council for the promotion of international trade for arbitration in accordance with its provisional rules of procedure. the decision made by this commission shall be regarded as final and binding upon both parties. arbitration fees shall be borne by the losing party ,unless otherwise awarded.

  11.其他条款

  other terms & conditions

  (1)甲方不得向经销地区其他买主供应本协议所规定的商品。如有询价,当转达给乙方洽办。若有买主希望从甲方直接订购,甲方可以供货,但甲方须将有关销售确认书副本寄给乙方,并按所达成交易的发票金额给予乙方_________%的佣金。

  party a shall not supply the contracted commodity to any other buyer(s) in the above mentioned territory. direct enquiries, if any, will be referred to party b. however, should any other buyers wish to deal with party a directly, party a may do so. but party a shall send to party b a copy of sales confirmation and give party b _________% commission on the basis of the net invoice value of the transaction(s)concluded.

  (2)若乙方在_________月内未能向甲方提供至少_________订货,甲方不承担本协议的`义务。

  should party b fail to pass on his orders to party a in a period of _________ months for a minimum of _________, party a shall not bind himself to this agreement.

  (3)对双方政府间的贸易,甲方有权按其政府的授权进行有关的直接贸易,而不受本协议约束。乙方不得干涉此种直接贸易,也无权向甲方提出任何补偿或佣金要求。

  for any business transacted between governments of both parties, party a may handle such direct dealings as authorized by party a's government without binding himself to this agreement. party b shall not interfere in such direct dealings nor shall party b bring forward any demand for compensation therefrom.

  (4)本协议受签约双方所签订的销售确认条款的制约。

  this agreement shall be subject to the terms and conditions in the sales confirmation signed by both parties hereto.

  12.本协议于_________年_________月_________日在_________签订,正本两份,甲乙双方各执一份。

  this agreement is signed on _________ at _________ and is in two originals;each party holds one.

  甲方(签字):_________ 乙方(签字):_________

  party a(signature):_________ party b(signature):_________

【英文合同】相关文章:

英文合同范文03-13

英文购销合同05-04

借款合同英文04-28

英文合同必备词汇03-19

精选英文合同三篇12-25

【精选】英文合同四篇12-26

精选英文合同四篇02-03

英文翻译合同02-28

【精选】英文合同4篇04-29

设备采购合同英文05-10