关于英文合同集合7篇
在人们愈发重视契约的社会中,越来越多事情需要用到合同,合同能够促使双方正确行使权力,严格履行义务。那么大家知道合同的格式吗?下面是小编精心整理的英文合同7篇,欢迎大家分享。
英文合同 篇1
销 售 合 同
SALES CONTRACT
编号:Contract No:日期: Date:
签约地点:Signed at:
卖方:Sellers:
地址:Address:
邮政编码:Postal Code:
电话:Tel: 传真:Fax:
买方:Buyers:
地址:Address:
邮政编码:Postal Code:
电话:Tel: 传真:Fax:
兹确认售予买方下列货品,其成交条款如下:
The Seller hereby confirms selling the following goods on terms and conditions
(3)公差:数量及总值均有_____%的增减,由卖方决定
Tolerance: With _____% more or less both in amount and quantity allowed at the
sellers option.
(4) 原产地
Country of Origin:
(5) 付款方式:30%预付,70%发货前一周付清
Payment terms: 30% deposit, 70% payment within one week before delivery.
(6) 交货时间:收到预付款后15天内完成装运。
Time of shipment: Within15 days after deposit received.
(7) 贸易方式:FOBShanghai
Terms of Shipment: FOBShanghai
(8) 包装:胶合板木盘外封铁皮
Packing: Plywood drum with steel sheet cover.
(9) 保险:由卖方按发票全额110%投保至_____为止的_____险。
Insurance: To be effected by seller for 110% of full invoice value covering _____ up to _____ only.
(10) 装运口岸:中国上海港
Port of Loading: Shanghai Port, China
(11) 转运:允许
Transshipment: Allowed
(12) 分批装运:允许分批装运
Partial Shipment: Allowed
(13) 目的口岸:
Port of Destination:
(14) 唛头:Shipping Marks:
(15) 单据:Documents:
(16) 品质与数量、重量的异义与索赔:Quality/Quantity Discrepancy and Claim:
(17) 逾期发运:如果由于买方原因造成逾期发运,买方承担责任。造成自签订合同之日起超过45天不能发运的,卖方将每日按货物金额的3%收取保管费;如果由于买方原因造成逾期发运超过6个月,卖方有权自行处置定金和货物。如果是卖方原因造成的逾期发运,卖方需提前告知买方并得到买方的确认并承担其他相关费用。
LAST SHIPMENT: if the late delivery is caused by the buyer, the buyer shall bear the
responsibility. If the delay has being made more than 45 days from the signing of the Sales Contract hereof, the buyer shall pay 3% of total amount each day, and if the delay is more than 6 months, the Seller has the right to dispose the down payment and the goods. If the late delivery is caused by the Seller, the Seller shall inform the Buyer in advance and get confirmation from the Buyer, and the related expense shall be born by the Seller.
(18) 质量/数量异议:对于质量方面的`异议,买方必须在货物抵达目的港后30天之类提出:对于数量方面的异议,买方必须在货物抵达目的港后15天之内提出。对由于保险公司、运输公司、其他运输机构或邮局的原因所造成的货物差异,卖方不负任何责任。 QUALITY/QUANTITY DISCREPANCY: In case of quality discrepancy, claim shall be filed by the Buyer within 30 days after the arrival of the goods at port of destination; while for quantity discrepancy, claim shall be filed by the buyer within 15 days after the arrival of the goods at port of destination. It is understood that the Seller shall not be liable, for any discrepancy of goods shipped due to causes for which the Insurance Company, Shipping Company, other transportation organization or Post Office are liable.
(19) 不可抗力:卖方对由于下列原因而导致不能或暂时不能履行全部或部分合同义务的,不负责任:水灾、火灾、地震、干旱、战争或其他任何在签约时卖方不能预料、无法控制且不能避免和克服的事件。但卖方因尽快地将所发生的事件通知对方,并应在事件发生后15天内将有关机构出具的不可抗力事件的证明寄交对方。如果不可抗力事件之影响超过120天,双方应协商合同继续履行或终止履行的事宜。
FORCE MAJEURE: Seller shall not be responsible for failure or delay in performance of entire or portion of these Sale Contract obligations in consequence of Force Majeure incidents: flood, fire, earthquake, drought, war, or any other matters couldn’t be foreseen or controlled or couldn’t be avoided. But Seller shall inform the incidents to Buyer immediately, and shall delivery the certificate of Force Majeure incidents issued by related organization within 15 days after the incidents happened. If the incidents influence more than 120 days, both parties shall negotiate to decide whether to execute or terminate the Sales Contract.
(20) 仲裁:因履行本合同所发生的一切争议,双方应友好协商解决,如协商仍不能解决争议,则应将争议提交中国国际经济贸易仲裁委员会(北京),依据其仲裁规则仲裁。仲裁裁决是终局的,对双方都有约束力。仲裁费应由败诉一方承担,但仲裁委员会另有裁定的除外。在仲裁期间,除仲裁部分之外的其他合同条款应继续执行。
ARBITRATION: All disputes across from the execution of, or in connection with this Sales Contract shall be settled friendly through negotiation, in case no settlement can be reached, the case shall then be submitted to China International Economic and
Trade Arbitration Commission, Beijing for arbitration in accordance with its provisional rules of procedure. The result of arbitration shall be born by the losing party except for the condition the Commission has other judgment. During the arbitration period, clauses beside of the arbitrated parts shall be executed.
(21) 本合同为中英文对应,一式两份,买卖双方各执一份;合同自卖方签字盖章、买方签字后生效(传真件以及扫描具有正版相等法律效应)。
The Sales Contract is concluded in Chinese and English with same effectiveness, and will come into effect on stamp of Seller and signing by Buyer. The Sales Contract is in dual original and each party shall have one original copy of this Sales Contract. (Any scanned and faxed copy shall have the same legal effect as the original one.)
(22) 备注:Remark:
买方确认签署: 卖方确认签署:
For and on behalf of Buyer:For and on behalf of Seller:
英文合同 篇2
ABC 服饰有限公司
ABC Garments & Accessories Co., Ltd
售货合约SALES CONTRACT
合同编号CONTRACT NO.ABC091102
日期DATE NOV. 02, 20xx
买方BUYER Arrabon Trading ,Unit 9, Central Office Park,
257 Jean Ave, Centurion
Tel: +357 27 664 0587 Fax: +357 27 664 0586
卖方SELLER ABC GARMENTS & ACCESSORIES CO., LTD
HONGXIN ROAD, HANGZHOU, ZHEJIANG,CHINATEL: FAX:
双方同意按下列条款由买方购进卖方售出下列商品:
The Buyers agree to buy and the Sellers agree to sell the following goods on terms and conditions as set forth below :
(1) 货物名称及规格,包装及装运墨头| (2) 数量 |(3) 单价| (4) 总价
Name of Commodity, Specifications, QuantityUnit Price Total Amount
boy’s denim long pant 1000PCSUSD9.50 USD9500.00 boy’s twill long pant1000PCS USD10.00 USD10000.00TOTAL: USD19500.00 SPECIFICATION AS BELOW:
Fabric: 100% cotton, 8 oz denim/40s40s 133/72 twill
Size: 9 – 36 month,Long pant with front mock(fake) fly,
waistband stud opening,back elastic with belt loops.
PACKING:
One polybag per pc, 10 pcs a carton-box, solid color/
per carton-box, 5 moisture-proofing agentper carton-box,
an inner-cover-cardboard per carton-box
MARK:
MAIN MARK :SIDE MARK:
ARRABONARRBON
DESRRIPTION:N.W.:
COLOR: G.W.:
QTTY :20xxPCSNO.: 1 TO UP/TOTAL CTN NOS.
(装运数量允许有5%的增减 Shipping QuantityFive Percent More or Less Allowed)
(5) 装运期限Time of Shipment50DAYS AFTER THE SELLER RECEIVE THE L/C.
(6) 装运口岸Port of loading SHANGHAI
(7) 目的口岸Port of Destination LIMASSOL, CYPRUS
(8) 保险投保InsuranceALL RISK AND WAR RISK COVERED BY BUYER
(9) 付款条件Terms of Payment IRREVOCABLE L/C AT SIGHT
该信用证必须在 45天 前开到卖方, 信用证的有效期应为装船期后15天, 在上述装运口岸到期,
否则卖方有权取消本售货合约并保留因此而发生的一切损失的索赔权 .
The covering Letter of Credit must reach the Sellers 45 Days Prior to the Shipment Date and is to
remain valid in above indicated Loading Ports 15 days after the date of shipment, failing which the Sellers reserve the right to cancel this Sales Contract and to claim from the Buyers compensation for losses resulting therefrom.
其他条 款 OTHER TERMS :
(1) 异议 : 品质异议须于货到目的口岸之日起30天内提出,数量异议须于货到目的口岸之日起15天内提出。 但均须提供经卖方同意的`公证行的检验证明. 如责任属于卖方者卖方
于收到异议20天内答复买方并提出处理意见.
QUALITY/QUANTITY DISCREPANCY: In case of quality discrepancy, claim should be filed
by the Buyers within 30 days after the arrival of the goods at port of destination, while for quantity discrepancy claim should be filed by the Buyers within 15 days after the arrival of the goods at
port of destination. In all cases, claims must be accompanied by Survey Reports of Recognized
Public Surveyors agreed to by the Sellers. Should the responsibility of the subject under claim
be found to rest on part of the Sellers, the Sellers shall, within 20 days after receipt of the claim,
send his reply to the Buyers together with suggestion for settlement.
(2) 信用证内应明确规定卖方有权可多装或少装所注名的百分数,并按实际装运数量议付。 (信用证之金额应较本售货合约的金额增加相应的百分数)
The Sellers reserve the option of shipping the indicated percentage more or less than the quantity hereby contracted, and the covering Letter of Credit shall be negotiated for the amount coveringthe value of quantity actually shipped. (The Buyers are requested to establish the L/C in accordwith the indicated percentage over the total value of order as per this Sales Contract.)
(3) 信用证内容须严格符合本售货合约的规定,否则修改信用证的费用由买方负担,卖方亦 不负因修改信用证而延误装运的责任。并保留因此而发生的一切损失的索赔权。
The contents of the covering Letter of Credit shall be in strict accordance with stipulations of the Sales Contract; in case of any variation thereof necessitating amendment of the L/C, the Buyersshall bear the expenses for effecting the amendment. The sellers shall not be held responsible for possible delay of shipment resulting from awaiting the amendment of the L/C, and reserve the right to claim from the Buyers compensation for the losses resulting therefrom.
(4) 除经约定保险归买方投保者外,由卖方向中国的保险公司投保。如买方须增加保险额或 须加保其他险,可于装船前提出,经买方同意后代为投保,其费用由买方负担。
Except in case where the insurance is covered by the Buyers as arranged, insurance is to becovered by the Sellers with a Chinese insurance company. If insurance for additional amountand/or for other insurance terms is required by the Buyers, prior notice to this effect mush reach the Sellers before shipment and is subject to the Sellers’ agreement, and the extra insurance premium shall be for the Buyers’ account.
(5) 买方须将申请许可证副本(经有关银行副署)寄给卖方俟许可证批出后再即用传真通知 卖方,假如许可证被驳退,买方须征得卖方的同意方可重行申请许可证。
The Buyers are requested to send to the Sellers authentic copy of the License-application
(endorsed by the relative bank) filed by the Buyers and to advise the Sellers by fax immediately
when the said License is obtained. Should the Buyers intend to file reapplication for License
in cases of rejection of the original application, the Buyers shall contact the Sellers and obtain the
latter’s consent before filing reapplication.
(6) 商品检验:产地证明书或中国有关机构所签发的品质数量/重量检验证,作为品质数量/ 重量的交货依据。
INSPECTION : The Certificate of Origin and/or the Inspection Certification of
Quality/Quantity/Weight issued by the relative institute shall be taken as the basis for the shipping Quality/Quantity/Weight
(7) 因人力不可抗拒事故,使卖方不能在本售货合约规定期限内交货或不能交货,卖方不负 责任,但是卖方必须立即以传真通知买方,如果买方提出要求,卖方应以挂号函向买方提供由中国国际贸易促进委员会或有关机构出具的证明,证明事故的存在。买方不能领
到进口证不能被认为系属人力不可抗拒范围。
The Sellers shall not be held responsible if they owing to Force Majeure cause or causes fail to
make delivery within the time stipulated in this Sales contract or cannot delivery the goods.
However the Sellers shall inform immediately the Buyers by fax. The Sellers shall delivery to
the Buyers by registered letter, if it is requested by the Buyers, a certificate issued by the China
council for the Promotion of International Trade or by any competent authority, certifying to the
existence of the said cause or causes. Buyers’ failure to obtain the relative Import license is notto be treated as Force Majeure.
(8) 仲裁 : 凡因执行本合约或有关本合约所发生的一切争执,双方应以友好方式协商解决,如果协商不能解决,应提交北京中国国际贸易促进委员会对外贸易仲裁委员会根据中国 国际贸易促进委员会对外贸易仲裁委员会的仲裁程序暂行规则进行仲裁,仲裁裁决是终 局的,对双方都有约束力。
ARBITRATION : All disputes arising in connection with the Sales Contract of the execution thereof shall be settled amicably by negotiation. In case no settlement can be reached, the case under dispute shall then be submitted for arbitration to the Foreign Trade Arbitration commission of the China Council for the Promotion of International Trade in accordance with the ProvisionalRules of Procedure of the Foreign Trade Arbitration commission of the China council for thePromotion of International Trade. The decision of the Commission shall be accepted as final andbinding upon both parties.
买 方卖方 THE BUYERSTHE SELLERS
.
英文合同 篇3
编号: No:
日期: date :
签约地点: Signed at:
卖方:Sellers:
地址:Address: 邮政编码:Postal Code:
电话:Tel: 传真:Fax:
买方:Buyers:
地址:Address: 邮政编码:Postal Code:
电话:Tel: 传真:Fax:
买卖双方同意按下列条款由卖方出售,买方购进下列货物:
The sellers agrees to sell and the buyer agrees to buy the undermentioned goods on the terms and conditions stated below.
1 货号 Article No.
2 品名及规格 description&Specification
3 数量 Quantity
4 单价 Unit Price
5 总值:数量及总值均有_____%的增减,由卖方决定。
Total Amount
With _____% more or less both in amount and quantity allowed at the sellers option.
6 生产国和制造厂家 Country of Origin and Manufacturer
7 包装: Packing:
8 唛头: Shipping Marks:
9 装运期限:Time of Shipment:
10 装运口岸:Port of Loading:
11 目的口岸:Port of destination:
12 保险:由卖方按发票全额110%投保至_____为止的_____险。
Insurance:To be effected by buyers for 110% of full invoice value covering _____ up to _____ only.
13 付款条件:买方须于_____年_____月_____日将保兑的,不可撤销的,可转让可分割的即期信用证开到卖方。信用证议付有效期延至上列装运期后15天在中国到期,该信用证中必须注明允许分运及转运。
Payment:
By confirmed, irrevocable, transferable and divisible L/C to be available by sight draft to reach the sellers before ___/___/_____ and to remain valid for ingotiation in China until 15 days after the aforesaid time of shipment. Tje L/C must specify that transhipment and partial shipments are allowed.
14 单据:documents:
15 装运条件:Terms of Shipment:
16 品质与数量、重量的.异义与索赔:Quality/Quantity discrepancy and Claim:
17 人力不可抗拒因素:由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。但是,受不可抗力事件影响的一方须尽快将发生的事件通知另一方,并在不可抗力事件发生15天内将有关机构出具的不可抗力事件的证明寄交对方。
Force Majeure:
Either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood, fire, earthquake, draught, war or any other events which could not be predicted, controlled, avoided or overcome by the relative party. However, the party affected by the event of Force Majeure shall inform the other party of its occurrence in writing as soon as possible and thereafter send a certificate of the event issued by the relevant authorities to the other party within 15 days after its occurrence.
18 仲裁:在履行协议过程中,如产生争议,双方应友好协商解决。若通过友好协商未能达成协议,则提交中国国际贸易促进委员会对外贸易仲裁委员会,根据该会仲裁程序暂行规定进行仲裁。该委员会决定是终局的,对双方均有约束力。仲裁费用,除另有规定外,由败诉一方负担。
Arbitration
All disputes arising from the execution of this agreement shall be settled through friendly consultations. In case no settlement can be reached, the case in dispute shall then be submitted to the Foreign Trad Arbitration Commission of the China Council for the Promotion of International Trade for Arbitration in accordance with its Provisional Rules of Procedure. The decesion made by this commission shall be regarded as final and binding upon both parties. Arbitration fees shall be borne by the losing party, unless otherwise awarded.
19 备注:Remark:卖方: Sellers: 买方:Buyers:签字:Signature: 签字: Signature:
英文合同 篇4
Address:
Telephone:
Party B: Address:
Telephone:
According to the provisions of the contract law of the People's Republic of China and the relevant laws and regulations, Party B accepts the entrustment of the first party and entrustment with the two parties through consultation.
First, entrustment:
Two, the way of payment:
1, Party A shall pay 40% of the total cost of the contract, namely ____ yuan (RMB) to Party B, Party B received the money after the start of design.
2. Party B shall provide complete design draft. After confirmation by Party A, the total amount of the total cost shall be paid.
Three. Design time:
1, Party B shall provide complete design draft in __ working days.
2, Party B shall complete the design work of party a company commissioned in _____ years __ month __ day (delay time by party a reason, work time should be postponed).
Four. The responsibilities and obligations of the two parties:
1, Party B shall, according to the requirements of Party A to finish the related work on time.
2, Party A has the responsibility to fully cooperate with Party B to carry out the work stipulated in this contract and provide relevant information according to the needs of Party B. Party A is responsible for the consequences caused by Party A's delay in the required information.
3. Party A shall provide complete design information before the start of the design, due to Party A's provision of incomplete information and changes in content.
For structural changes, Party A shall pay the corresponding cost of design changes.
4. After Party B receives the complete design information of Party A, it is designed to facilitate the determination of the style of Party A, and Party B begins to design the first draft after the style is determined.
5, Party A has the right to put forward amendments to the works designed by Party B. The first draft Party A can make a structural modification. After the first draft is determined, the structural modifications should be made. Party A shall pay the corresponding cost separately.
6. The consequences of the delay due to the amendment of Party A shall be borne by Party A.
7, due to the loss caused by post production by Party A alone, the loss caused by problems in the design of the product is borne by Party B. The legal liability caused by copyright, for the economic disputes shall be borne by Party a..
8. During the course of the project, Party B is attached to the brand of Party A and shall not sign any form of cooperation agreement with the customer in the identity of Party B.
Five. The agreement on intellectual property rights:
1, Party B has the copyright of the works completed by the design. After the settlement of all the fees designed by Party A, Party B may transfer the copyright of the works to Party A.
2. Before Party A has not paid all the cost of the design, the copyright of the works designed by Party B shall be attributed to Party B, and Party A does not have any right to the work.
3. Party A shall have the right to investigate the legal liability of Party A if it uses or amends the works designed by Party B before the payment is not paid.
Six. Liability for breach of contract:
1, Party A terminates the contract before the completion of the first draft of the design work. The prepaid expenses have no right to request the return. If a party terminates the contract after the completion of the first draft of Party B's work, it shall pay the full design fee.
2. If Party B terminates the contract without proper reasons, the fees charged shall be returned to Party A.
Seven, if a party or a party has a dispute over the performance of this contract, it shall be settled amicable through negotiation. If either party fails to negotiate, any Party A and B can submit it to the Beijing Arbitration Commission for arbitration.
Eight, the contract is effective from the date of signature by Gai Zhang and both parties. The contract is two copies in one form. Each party has one contract signed by the other party (Gai Zhang), which has the same legal effect.
Nine. If there is no matter in this contract, the two parties shall jointly discuss and supplement the contract. The contents of the supplement and modification are equally valid to this contract.
Party A: Party B:
(signature seal) (signature seal)
Date: Date:
中文版
地址:
电话:
乙方:地址:
电话:
依据《中华人民共和国合同法》和有关法规的规定,乙方接受甲方的委托,就委托设计事项,双方经协商一致,签订本合同,信守执行:
一、委托事项:
二、付款方式:
1、甲方需在合同签订之时支付总费用的40% ,即____元(人民币)给乙方,乙方收到甲方的款项后开始设计。
2、乙方提供完整的设计稿,甲方确认后,应当即付清总费用的全部余款。
三、设计时间:
1、乙方需在__个工作日内提供比较完整的设计稿。
2、乙方需在_____年__月__日完成甲方公司委托的设计工作 (由甲方原因耽误的时间,完稿时间应顺延)。
四、双方的责任与义务:
1、乙方应按甲方要求按质按量按时完成相关设计工作。
2、甲方有责任全力配合乙方开展本合同所规定的工作,并根据乙方需要提供相关资料。由于甲方提供所需资料延误时间造成的后果,由甲方承担。
3、甲方应在设计开始前提供完整的`设计资料,由于甲方提供资料不完整、内容改动而造成的设
计结构改动,甲方须另行支付相应的设计改动费用。
4、乙方收到甲方的完整设计资料后进行部分小样设计以方便甲方确定风格,风格确定后乙方开始进行初稿设计。
5、甲方有权对乙方所设计的作品提出修改意见,初稿甲方可提出一次结构上的修改,初稿确定后的结构修改,甲方须另行支付相应费用。
6、因甲方修改,延误时间造成的后果,由甲方承担。
7、由于后期制作造成的损失由甲方独自承担,由于制作物设计出现问题造成的损失由乙方承担。 因版权、文责所引发的法律责任,经济纠纷由甲方承担。
8、设计项目期间乙方挂靠于甲方品牌之中,不得以乙方身份单独与客户签订任何形式的合作协议。
五、知识产权约定:
1、乙方对设计完成的作品享有著作权。甲方将委托设计的所有费用结算完毕后,乙方可将作品著作权转让给甲方。
2、甲方在未付清所有委托设计费用之前,乙方设计的作品著作权归乙方,甲方对该作品不享有任何权利。
3、甲方在余款未付清之前擅自使用或者修改使用乙方设计的作品而导致的侵权,乙方有权追究其法律责任。
六、违约责任:
1、甲方在设计作品初稿完成前终止合同,其预付的费用无权要求退回;甲方在乙方作品初稿完成后终止合同的,应当支付全额的设计费用。
2、乙方如无正当理由提前终止合同,所收取的费用应当全部退回给甲方。
七、甲乙双方如因履行本合同发生纠纷,应当友好协商解决,协商不成的,甲乙双方任何一方均可向北京仲裁委员会提请仲裁解决。
八、本合同自甲乙双方签字盖章之日起生效,本合同一式两份,双方各持对方签字(盖章)合同一份,具有同等的法律效力。
九、本合同如有未尽事宜,由甲乙双方共同讨论补充或修改。补充和修改的内容与本合同具有同等效力。
甲方: 乙方:
(签字盖章) (签字盖章)
日期: 日期:
英文合同 篇5
The buyer: the seller: ____________ ____________
Address: Address: ____________ ____________
Tel: ____________ Tel: ____________
Fax: Fax: ____________ ____________
Contact: Contact: ____________ ____________
The sale of the friendly negotiation of both parties, the buyer seller commissioned processing production ________ mould Co ______ set. The two sides reached the following processing agreement
Basic mould of die:
Product name serial number part name point number (mold type) mold single price (RMB yuan) delivery condition
Total price: (including 17% VAT)
The above set of mould material: _____________________
(the above mold materials are provided by the seller).
I. The rights and responsibilities of the two parties:
Buyer's responsibility and rights are as follows:
1. the buyer is responsible for the delivery of the R & D requirements and plans of the seller's project, and provides the sales forecast as far as possible.
2. the buyer is responsible for the delivery of the product design drawings and other related technical information required by the seller to the seller and the technical support.
3., the buyer has the sole right to interpret the product design drawings and related technical data delivered to the seller. When there is ambiguity, the Seller shall consult the buyer's opinion and confirm it by the buyer.
4. after the seller completes the design and manufacture of the mould, the buyer will go to the seller's site to verify the mold, or to provide the product sample to the buyer for confirmation and confirmation by the seller. The moulds referred to in this contract include the mould of the product itself and the fixture and mould needed for the subsequent production.
The rights and responsibilities of the seller are as follows:
1. the seller is responsible for the design and manufacture of the moulds according to the product design drawings and other related technical information provided by the buyer.
Be responsible for completing the mold according to the buyer's design requirements in accordance with the stipulations of the contract.
2. the Seller shall be responsible for providing timely certification and sample test, trial production of desired products. At the same time the seller must provide the details of the related products.
The detailed test report is for the buyer's confirmation. In case of repair / modification, the test report is also attached at the same time.
The buyer does not bear any responsibility.
1.5 the Seller shall give the buyer the corresponding compensation in the form of the buyer's approval as the seller causes the buyer to spend the labor and cost outside the normal technical support as a result of the seller's cause.
2. the progress of the model:
2.1 the seller after the receipt of the buyer after the confirmation of product drawing, which began to enter the mold design and production stage, open cycle for ________ days
2.2 due to buyer's cause the delay of mold making progress is not calculated.
2.3 if the seller's mold making process and other mistakes lead to the failure of the mold to be accepted and the buyer is in urgent need of production.
At the same time, the production should be arranged with the existing mold, and the die should be reopened according to the requirements of the drawings and samples.
3. mode of payment:
Party B agrees that Party A will pay the payment as follows.
3.1 separate settlement: Monthly knot, 60 days after the opening of the ticket, open 17% VAT invoices.
3.1.1 of the total amount of the contract manufacturing batch mould (including VAT) for RMB _________ yuan (RMB ________ yuan), the buyer to pay the total amount of _____% mold, mold ___% residual cost allocation in the first 50K products, if the number of orders less than 50K, the buyer shall supply the seller after the unamortized tooling cost.
3.1.2 from the two sides after the signing of the contract, the seller to provide value-added tax invoices (mold total ____%), the buyer within twenty working days of payment.
4. product order: only after the quality acceptance of the product sample is qualified and the buyer's written confirmation, the seller may accept the order of the third party authorized by the buyer or the buyer. The order contract signed by third parties authorized by the buyer with the buyer's seller is subject to this contract.
Four, product quality assurance
After the seller has completed the mold, the Seller agrees to guarantee the quality of the product in accordance with the buyer's quality standard (the first confirmation report).
The buyer reserves the right to modify the content of the quality standard in accordance with the actual needs.
Five. The ownership of the mold
1. the ownership of all moulds and clamping fixtures and their assembly drawings and parts drawings (including 2D and 3D) involved in the contract shall be owned by the buyer, and the Seller shall not interfere with the buyer's disposition of the molds. If the seller is responsible for the custody of the seller, the Seller shall not supply the mould to the third party without the buyer's consent, otherwise the buyer shall have the right to ask the seller to return the mold fee and compensate for the loss.
2. when the buyer pays the mold cost, the seller must cooperate with the buyer or the third party designated by the buyer to transfer the inspection and accept the replacement of the die from the seller's place, and will replace the worn parts at the expense of itself, so as to ensure the restart of production. The seller is obliged to assemble, rust and pack the moulds and send it to the place designated by the buyer. All mold assembly drawings and part drawings (including 2D and 3D) and all clamping devices must be transferred to the buyer at the same time.
3., during the process of mold transfer, such as the improper assembly, rust prevention or packaging of the seller, it will cause damage to the mold, and all direct and indirect losses arising therefrom shall be borne by the seller.
Six, mold maintenance
1., the Seller guarantees the service life of the mould 500 thousand times, and the seller is responsible for free maintenance during this period. If the mold is not used during the service life, the Seller shall be responsible for changing or re opening the mold and taking the corresponding cost.
2. the seller should die changes, maintenance and repairs in a timely manner and register, whether such a modification, maintenance and repair are
The buyer made it. If the buyer is to ask the relevant technical details or evidence, the buyer may register with the time without notice. The Seller shall give the buyer a copy of the record once every three months. The seller should take the initiative to complete this task on a regular basis without the buyer's request.
Six. Intellectual property rights
The product and the buyer 1. involved in this contract to provide design drawings and other information in the intellectual property is owned by the buyer, the buyer without permission, the Seller shall not disclose to any company or individual, otherwise all the losses resulting from the seller; the buyer only agreed to all data and information provided by the seller by the buyer the purpose of this contract based on the,
2. the Seller agrees to the design drawings will not be provided by the buyer and other data or information for the purpose of non contract other than the seller or the buyer has the right to pursue responsibility; without written permission from the buyer, the Seller shall not in publications, advertising or other written and oral form to the seller to provide or have provided any data and information.
3., without the buyer's license, it is strictly prohibited for the seller to use this mould to supply other customers other than the buyer or the buyer's designated customer, otherwise all direct and indirect losses arising from it shall be the seller's responsibility.
4. other undisclosed matters of confidentiality are carried out in accordance with the "confidentiality agreement" signed by the buyer and the seller.
Seven. Liability for breach of contract
1. the Seller shall be liable for breach of contract if the seller fails to complete the mold making and sample delivery according to the progress of each stage specified in the 2.1. The Seller shall pay the buyer a fine of 2% of the total amount of this contract at a time of one day of delay. The amount of the penalty is not more than the total amount of the contract.
2., if the seller's cause causes the seller's quality to be supplied to the buyer can't meet the buyer's requirements, and the other materials will be lost and scrapped during the assembly process, the seller will fully compensate for the loss and scrap materials and the resulting artificial / stop line costs. The two parties may sign separately the raw material for production.
3. the quality and progress of the product provided to the buyer by the seller for the seller's cause can not reach the buyer.
Place)
3. when the mold is certified by the buyer, the seller is responsible for the seal of the mold. If the buyer agrees that the seller is responsible for the subsequent processing and production of the products, the Seller shall be responsible for the repair and maintenance of the moulds, and the Seller shall make the batch production according to the order of the third party authorized by the buyer or the buyer.
4. for all the molds produced by the buyer, the Seller shall provide the buyer with detailed design drawings. All drawings must be made in AutoCAD or pro-eng (pro-el2) and must be transmitted to the buyer in electronic form before the mold opening for approval.
Two. Technical terms:
1. repair and maintenance of the mold: the seller is responsible for the repair and maintenance of the mold during the production process.
2., after no dispute between the two sides, the buyer will provide the product design drawings and related technical information to the seller, and send the engineer to the seller's technical exchange or the seller send the engineer to the buyer for technical communication. The product drawings and technical requirements list is attached to Annex 1.
3. the seller promised to use the quality requirements of the mold for the system to produce products to the buyer
4. the seller promised to use the mold for the system to produce the product can reach the seller's delivery capacity:
Nissan energy: _______k, monthly capacity: ______k
5. the seller promises that all the moulds involved in this contract can be reached to 400 thousand times.
6., without the buyer's permission, it is strictly prohibited for the seller to contract the whole part of the contract involved in the contract to other companies for processing. Otherwise, the Seller shall be liable for breach of contract in accordance with the breach clause of the contract as a breach of contract.
Three. The terms of business:
1. mold price:
1.1 after negotiation between the two parties, the seller will provide the final offer of the mould approved by the buyer and sign the price confirmation as an indispensable part of the contract.
The total amount of 1.2 contract (including VAT mold ____%) rmb_______.
1.3 the total cost of the price of the mold contains the following expenses, and the Seller shall not ask the buyer for the following reasons:
1.3.1 the cost of all the fixtures and tools required by the seller for the molding / two processing / assembly of the product;
1.3.2 the seller, according to the contract, carries out the cost of material, equipment and manpower for mould design, test mould.
1.3.3 the cost of the sample (800 sets) provided by the seller to the buyer for the certification of the mold and product;
1.3.4 the seller is the cost of the die vulnerable spare parts to ensure the normal production of the mold;
1.3.5 the cost of the related tools and tools for other processes that are prepared for the normal production of the product.
1.4 when the written request of the buyer the seller according to the change of the product design for the mould modification, if the mould modification is relatively simple, including less mold material changes and other simple changes from the mold, the seller to the buyer without charges; if the modification is complex, great influence on the whole structure of the mold, then the seller according to the modified working hours for mold to the buyer by the buyer offer, the corresponding mold modification cost. The buyer shall not bear any responsibility for the repair or modification of the mold due to the seller's reason, due to the failure of the mold to meet the buyer's requirements.
1.5 by the seller to the buyer's manual and cost technical support from the normal cost, the Seller shall give the buyer recognized the way the corresponding compensation.
2. the progress of the model:
2.1 after the seller has received the product drawing file after the buyer's confirmation, that is,
The cost of artificial / stop line formation. The two parties may sign separately the raw material for production.
3. if the seller has caused the seller to the buyer of the product quality and schedule is not up to the requirements of the buyer, the buyer and customer missed the best time to market, or the buyer was forced to cancel the project, so that the buyer and its customers suffer serious losses and loss of material research, in addition to the seller to refund all previous the buyer to pay the purchase price, depending on the actual situation of the seller also bear the buyer direct and indirect economic losses.
4., if the seller is unable to resist force, including the war, fire, strike, and other force majeure caused by Chinese law, the buyer will allow the buyer to dismiss it. The Seller shall notify the buyer in written form within 24 hours after the occurrence of the force majeure, and the seller is obliged to take all necessary measures to deliver the goods as soon as possible. If the force majeure continues for more than 2 weeks, the buyer has the right to cancel this contract.
5. other unfinished matters: implemented in accordance with the economic contract law.
Eight. Dispute settlement
Any dispute arising from the execution of this contract shall be settled through friendly negotiation first. If no negotiation can be reached within 30 days, either party can submit the dispute to the municipal court.
The parties to this contract shall be strictly enforced. If one party fails to perform the contract in the cause of the contract, the party must ask for the consent of the other party two weeks in advance, and the contract shall be terminated.
The buyer: the seller: ____________ ____________
Representative: Representative: ___________ ____________
英文合同 篇6
在签订域名转让合同中,甲方向乙方缴纳域名注册费用,乙方向甲方提供域名注册服务。
签署日期 The date of signature
出让方(甲方): Assignor (Party A):
受让方(乙方):Assignee (Party B):
根据国家有关法律、法规以及相关规定,甲、乙双方在自愿、平等、互利的基础上,经协商一致域名转让事宜,订立本合同,以资信守:
According to the law, on the basis of voluntary will, equality and mutual benefit, parties A and B conclude the contract with mutual agreement.
一、 域名情况及转让范围 The status of the domain name and the scope of the assignment
1、 甲方合法拥有下列域名: 在规定期限内的管理权,使用权,所有权。
Party A enjoy the managing, using and property right about the following domain name in prescribed terms.
2、 甲方同意将上述域名的权限完全转让乙方所有。
Party A agrees to assign above-mentioned right totally to Part B.
3、 以下是域名的详细信息:
Following is the details of the domain name: :
当前注册人(出让人)Current registered person
新注册人(受让人)The new registered person (B)
注册人(中文名称) Registrant(Chinese)
注册人(英文名称) Registrant(English)
地址 The address
国家 Country
邮编 Zip Code
电话 Telephone No.
传真The Fax No.
电子邮箱The email address
所属注册商Authorized agent
注册时间Registration time
二、转让价格及支付方式 The assignment fees and the payment
1、 出让总价:, The total assignment fees:
2、 乙方必须在甲方完成转让注册前一次性支付所有费用(即甲方将过户文件提交北京注册商总部前)
Party B should pay off the total assignment fees in one time before the completion of the assignment deed.
3、 甲方收到转让费用后办理转户手续。(以当地银行收到款项为准)
After receiving the assignment fees, party A would perform the transfer procedure. (The receipt time refers to the payment is received in local bank)
4、 其他费用: 甲方支付Other expenditure : It is paid by party A
二、 双方权利与义务、域名过户流程及其他
The liability of two parties and assignment procedure
1、 双方权利与义务: Rights and obligations of two parties:
a、甲方保证合法拥有以上所述域名的`所有权、管理权、使用权,如有欺诈行为将承担
相关的民事和刑事责任;
The party A guarantees that it enjoys above mentioned property, managing and using right. If there were any fraud, it would bear the correlative civil or criminal liabilities.
b、甲方收到转让费用后5个工作日内为乙方办理过户事宜,不得拖延;
The party A will proceed the assignment in 5 workdays after it gets the assignment fees and there is not any delay.
c、过户后乙方使用此域名产生的一切后果及责任与甲方无关,由乙方承担全部责任;
Concluded the assignment, any result and liability, which Party B will bring in the process of using of the domain name, is none of the business With Party A and should be born by Party B.
2、 过户流程:Transfer flow:
a、 乙方在该域名的注册商官方站下载过户资料表格,填好后签字盖章EMS邮寄到甲方;
Party B should download the data sheet for assignment from the official website of the authorized agent, execute and post it to Party A by EMS.
b、 甲方在收到乙方的过户资料后,经审核无误后签字并盖章;
Party A should execute the assignment data sheet after receiving and checking out it free from error.
c、 财务到帐后,甲方将完整的过户文件EMS提交至北京注册商总部;
Party A can submit the whole documents to the authorized agent once Party A gets the assignment fees by EMS.
d、 北京注册商总部收到过户资料后,在2-5个工作日内将把原注册内容替换成新注册人的信息;
Receiving the documents for assignment, the authorized agent would replace the original information of assignor as the new information about assignee in 2 to 5 workdays.
e、 完成过户手续后,乙方可在中国互联网信息中心官方站查询该域名的WHOIS,核对
无误后发传真或电子邮件给甲方做最后的确认。
Concluded the assignment, Party B can search WHOIS of the domain name on the official website of China Internet Network Information Center. After checking, Party B should send email to Party A for confirmation.
3、双方应本着诚实信用的原则履行本合同。任何一方在履行中采用欺诈、胁迫或者暴力的手段,另一方可以解除合同并有权要求对方赔偿损失。任何一方在履行中发现或者有证据表明对方已经、正在或者将要违约,可以中止履行本合同,但应及时通知对方。甲方提前解除合同,无权要求乙方返还域名并应对乙方遭受的损失承担赔偿责任,乙方无故解除合同,应返还甲方上述费用以及域名。
The two parties should take the principle of good faith performance of this contract. The use of any party in the performance of fraud, coercion or violent means, the other party may terminate the contract and the right to demand compensation for damages. Found in the performance of any party, or there is evidence that the other party have been, are or will default, may suspend the performance of the contract, but shall promptly notify the other party. Where party A early termination of the contract, no right to demand the return of the domain and should bear the liability for losses of party B, where party B terminate contract without valid reason, these costs should be compensated to A and the domain name should be returned to party A.
4、 其他: 其余未尽事宜双方协商解决。
Other matters: The remaining outstanding issues resolved through mutual consultation.
三、 合同双方签署后生效Contracts enters into force after execution.
合同壹式两份,甲、乙方各持壹份。
The contact shall be executed in two counterparts, each party holds one.
出让方(甲方): 受让方(乙方):
Assignor (Party A) : Assignee (Party B):
英文合同 篇7
IRREVOCABLE COMMISSION AGREEMENT 佣
的下列条件发展业务关系:
This Commission Agreement ("Agreement") is between the parties concerned on August , 20xx in Beijing, China on the basis of equality and mutual benefit to develop business on terms and conditions mutually agreed upon as follow: In consideration of the mutual agreements and covenants herein contained, the parties hereto agree as follows: 合约号码:
Contract No. :
1. 协议开始日期: AGREEMENT INITIATION DATE:
本协议从 ___________ , 20xx开始生效。 This agreement enters into force on _______________ , 20xx.
2. 协议方: PARTIES:
本协议涉及以下各方:
This agreement is made and entered by and between:
甲方: PARTY A:
公司: COMPANY:
地址: ADDRESS:
国家: COUNTRY:
电话: TEL:
传真: FAX:
电子邮件: E-MAIL:
AND 和
乙方: PARTY B:
公司: COMPANY:
地址: ADDRESS:
国家: COUNTRY:
电话: TEL:
传真: FAX:
电子邮件: E-MAIL:
金 协 议 本佣金协议书于20xx年08月 日在中国北京由双方在平等互利基础上达成,按双方同意
3. 委任: Appointment
甲方指定乙方为其在中国的全权采购代理,采购甲方指定的烯烃芳烃加氢和异构化催化剂,瓦斯油(AGO+VGO)脱硫催化剂,石脑油加氢催化剂(详见产品采购合同)。
The Party A appoints the Party B as its Exclusive Purchasing Agency in China, purchasing the goods as Part A refers. Olefins, Aromatics Hydrogenation and Isomerisation Catalysts,Gas Oil Desulfurization Catalyst(AGO+VGO),Light Naphtha Hydrotreater Catalyst.(Details as per Purchase Contract)
4. 双方的职责: Duties of two parties:
(1) 甲方所需的采购业务应提交给乙方详细的采购产品信息,比如材质、尺寸、数量、品质等具体要求。Party A shall provide all the information of the purchasing products to Party B, such as material, size, quantity, quality and other concrete requirements.
乙方向甲方提供采购产品客户信息,代理信息,代理租船顾问业务等。负责落实甲方采购产品资源,渠道和谈成供货意向一并介绍给甲方。
Party B shall provide Party A customers’information and agent information, consultancy service on agents chartering. Besides, he shall find and confirm the products resources and supply channel, then introduce these information totally to Party A.
(2) 因甲方购买的产品涉及专利产权和产品生产者指定代理的情况,乙方负责促成甲方与产品生产者或产品生产者代理商之间签署采购协议,实现贸易,并负责为甲方对采购产品取样、验货、出货等的环节进行服务。
Party B shall help and facilitate Party A sign the Purchasing Agreement with the suppliers or agents, also should provide services in many aspects, such as sampling, inspection, delivery and other matters.
5. 货款的支付方式:Payment of goods
甲方购买的产品涉及专利产权或产品生产者指定代理的情况,甲方与产品生产者或产品生产者代理商之间直接签署采购协议,货款支付方式由协议双方协商达成一致。
Party A will sign Purchasing Agreement directly with producers or its agents, and the
payment term of goods will be negotiated and agreed by Party A and the Seller.
6. 佣金的计算、给付方式、给付时间: Commission calculation, payment methods, payment time 甲方同意按照采购产品总金额的(1-5)%支付佣金给乙方,支付日期为付款给卖方的同一天,佣金汇入乙方指定银行账户。如甲方以预付款或分期付款的形式向卖方支付货款,在甲方向卖方支付第一笔货款的同时向乙方全额支付采购产品总金额的佣金。
For the Purchasing Agent's services, the Party A shall pay the Party B the following commission percentage:(1-5)% of Part B’s purchasing aggregate amount of the invoice value,simultaneously within the same banking day as the party A makes payment to the Seller. Commission should be remitted to Party B’s designated bank account. If the Party A makes advance payments to the Seller or payment by installments, he should pay the commission to Party B simultaneously with the first payment he made to the Seller.
7. 违约责任:
(1) 甲方若不按本合同第6条的执行,逾期一天应支付乙方滞纳金,滞纳金系数为:总佣金的5‰/天。
Party A if not in this agreement and article 6, execution of expired day shall pay party B overdue fine, fine for delaying payment coefficient for: the total commission 5‰/ day.
8. 协议的修改: Modification
此协议书只有经双方共同签字后才能作修改,
This Agreement may not be modified except by amendment reduced to writing and signed by both Parties.
9. 不可抗力: Force Majeure
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。但是,受不可抗力事件影响的'一方须尽快将发生的事件通知另一方,并在不可抗力事件发生15天内将有关机构出具的不可抗力事件的证明寄交对方。
Either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood, fire, earthquake, draught, war or any other events which could not
be predicted, controlled, avoided or overcome by the relative party. However, the party
affected by the event of Force Majeure shall inform the other party of its occurrence in writing as soon as possible and thereafter send a certificate of the event issued by the relevant authorities to the other party within 15 days after its occurrence.
10. 仲裁: Arbitration
因履行本协议所发生的一切争议应通过友好协商解决。如协商不能解决争议,则应将争议提交中国国际经济贸易仲裁委员会(北京),依据其仲裁规则进行仲裁。仲裁裁决是终局的,对双方都有约束力,仲裁费用,除另有规定外,由败诉一方负担。
All disputes arising from the performance of this agreement shall be settled through friendly negotiation. Should no settlement be reached through negotiation, the case shall then be submitted for arbitration to the China International Economic and Trade Arbitration
Commission (Beijing) and the rules of this Commission shall be applied. The award of the arbitration shall be final and binding upon both parties. Arbitration fees shall be borne by the losing party, unless otherwise awarded.
11. 协议有效期: Validity of Agreement
本协议经有关双方如期签署后生效,有效期为年,从20xx年08月 日到 年 月 日。
This agreement, when duly signed by the both parties concerned, shall remain in force for years, from August , 20xx to XX , XX .
12. 协议的终止: Termination
在本协议有效期内,如果一方被发现违背协议条款,另一方有权终止协议。
During the validity of this agreement, if either of the two parties is found to have violated the stipulations herein, the other party has the right to terminate this agreement.
13. 本协议于20xx年08月 日在北京签订,一式两份,双方各执一份。
This Agreement is signed on ... in Beijing and is in two originals;each Party holds one.
14. 甲方与产品生产者或产品生产者代理商签署的采购协议要向乙方提供一份原件,并在采购协议中将乙方作为甲方代理的身份体现。
The Party A shall provide Party B an original Purchasing Contract signed between him and the Seller, and in the Purchasing Contract, shall show Party B is the Agency of Party A.
甲方: Party A:乙方: Party B:
(签字) (签字)
(Signature)
(Signature)
【英文合同】相关文章:
英文合同05-16
借款合同英文12-11
英文合同[荐]07-01
英文合同(实用)07-07
英文合同范文10-04
【精选】英文合同4篇09-11
关于借款合同英文12-11
英文翻译合同02-28
精选英文合同三篇12-25
购销合同模板英文04-06